Action planned to protect iconic Scottish Borders building

Bernat Klein Studio
Bernat Klein Studio
This article is brought to you by our exclusive subscriber partnership with our sister title USA Today, and has been written by our American colleagues. It does not necessarily reflect the view of The Herald.
Close Icon

What is the Public Notice Portal?

The Public Notice Portal carries statutory public notices published in local newspapers and is the fastest and most effective way of finding out what is happening in YOUR neighbourhood.

Search the Public Notice Portal

Action is planned to protect one of Scotland's most significant postwar buildings after “two decades of neglect and vandalism”.

A consortium of heritage and design organisations received the keys for the Bernat Klein studio near Selkirk last year after securing it at auction.

Full restoration of the building originally designed by brutalist architect Peter Womersely is expected to cost more than £3m.

Plans for the first stage of stabilisation work have now been submitted to Scottish Borders Council (SBC).

The Bernat Klein Studio Coalition – made up of the Bernat Klein Foundation (BKF), the National Trust for Scotland and the Scottish Historic Buildings Trust – was set up to save the building from ruin.

The Bernat Klein Studio near Selkirk (Image: NTSMedia Pics/PA)

The first phase of work will aim to secure the property, which has been on the Buildings at Risk Register since 2002 and is in a severely dilapidated state.

Once completed, the coalition plans to return The Studio to its original use as a design studio.

It will also provide a permanent base in the Borders for the BKF and its exhibitions, workshops and talks.

A supporting statement to SBC seeking listed building consent outlines the reasons for the stabilisation and investigation work.


READ MORE:

Bernat Klein Studio rescue project shortlisted for major award

Modernist landmark saved after being bought for £279k

Coalition formed to save Modernist landmark from ruin


It states: “The Studio is in significant disrepair following two decades of neglect and vandalism.

“The building has begun to suffer from loss of fabric, most notably the fall of one of the projecting concrete nibs at first floor level on the southwest corner.

“It is imperative that that both the significance and the technical functioning of the Studio are fully understood before designs for the restoration are developed.

“This will allow informed design and repair decisions to be made that will ensure the building’s significance is protected and enhanced, and not diminished.”

Works are earmarked to reduce the risk of unauthorised entry, for example, by improving and replacing existing temporary boarding to damaged windows and introducing timber framing around sliding windows.

The aim is to reduce the risk of further deterioration to damp affected fabric, for example, by temporarily covering and altering upper roof pitches to minimise ingress.

The plan also involves removing fittings, fixtures and finishes that have been identified as unoriginal, to allow underlying fabric to be exposed and assessed, for example, stripping out boilers, radiators and kitchen and bathroom fittings and linings.

Get involved
with the news

Send your news & photos